Skip to main content
Loading…
This section is included in your selections.

A. A development application shall include the information required by the Director to make a finding of transportation concurrency. The application shall include, at a minimum:

1. The location and type of the development based upon classification categories as set forth in the ITE Manual;

2. An estimate of the projected net new average weekday PM peak hour trips that will be generated by the development prepared as set forth in the ITE Manual;

3. A trip distribution for project-generated average net new weekday PM peak hour trips, prepared in compliance with generally-accepted traffic engineering methods.

B. The Director may require submission of additional information prior to making a finding of transportation concurrency. (Ord. M-4026 §15, 2012; Ord. M-4001 §2, 2011)