Skip to main content
Loading…
This section is included in your selections.

The Director may require any User to develop and implement an Accidental Discharge/Slug Discharge Control Plan and take other actions the Director believes are necessary to control discharges which may be caused by spills or periodic nonroutine activities. Accidental Discharge/Slug Discharge Control Plans shall include at least the following:

A. A description of all discharge practices, including any nonroutine batch discharges such as from cleaning, replenishment, or disposal;

B. A description of all stored chemicals, disclosing all ingredients in formulations which could violate a discharge prohibition if discharged to the POTW;

C. The procedures for immediately notifying the Director of any accidental or slug discharge, as required by Section 14.10.350 of this Ordinance; and

D. The procedures that will be taken to prevent the occurrence or adverse impact from any accidental or slug discharge. Such procedures shall address the inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. (Ord. M-3970 §2, 2010)