Skip to main content
Loading…
This section is included in your selections.

The Director may modify a wastewater discharge permit or other control document for good cause, including, but not limited to, any of the following reasons:

A. To incorporate any new or revised Federal, State, or local Pretreatment Standards or requirements including new or revised local limits;

B. To address new or changed operations, processes, production rates, waste streams, or changes in water volume or character;

C. To reflect conditions at the POTW requiring an authorized discharge to be reduced or curtailed. Such requirements may be either temporary or permanent;

D. Based on information that indicates a permitted discharge poses a threat to the City’s POTW or staff, the receiving waters, or to violate a prohibition of this Ordinance;

E. To address violations of any terms or conditions of the wastewater discharge permit;

F. To address misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required report;

G. To incorporate revisions based on a variance from Categorical Pretreatment Standards approved pursuant to 40 CFR Part 403.13;

H. To correct typographical or other errors in the wastewater discharge permit; or

I. To reflect a transfer of the facility ownership or operation to a new owner or operator as required under Section 14.10.260. (Ord. M-3970 §2, 2010)