Each User must notify the Director of any substantial changes to the User’s operations or system which might alter the nature, quality, or volume of its wastewater. This notification must be made at least thirty (30) days before the desired change and be sent to both the Control Authority (Director) and the receiving POTW if they are different. In such cases:

A. The Director may require the User to submit any information needed to evaluate the changed condition. The Director may also require a new or revised wastewater discharge permit application under Section 14.10.190 of this Ordinance; and

B. The Director may issue, reissue, or modify a wastewater discharge permit applying the procedures of Part 5 of this Ordinance in response to a User’s notice under this Section. (Ord. M-3970 §2, 2010)