A. Submission requirements. At the time of construction of a project or phase of development that was approved as part of the concept development plan, the applicant shall submit the following documentation demonstrating that the proposed project or phase is in substantial compliance with that contained in the original approval by means of a site plan review, using procedures contained in 20.270 VMC. An application submitted for a detailed development shall include the following:

1. Detailed site plan.

2. Elevations of all buildings.

3. Landscape plan.

4. Erosion control plan.

5. Stormwater management plan including low impact development site analysis determining feasibility of using LID techniques.

6. Narrative documenting the following:

a. Compliance with all development and design standards in the base zone, as modified in the initial concept plan approval.

b. Compliance with all relevant conditions of approval.

c. Consistency with traffic, parking and infrastructure plans contained in the initial concept plan approval. (Ord. M-4179 § 70, 10/17/2016; Ord. M-3643, 01/26/2004)