Skip to main content
Loading…
This section is included in your selections.

Click here to view prior versions of this section.

The following Table 6.12.210 lists garbage rates charged for container service:

Table 6.12.210. (2024 Rates)

Regular Containers

Size

(In Yards)

Weekly Frequency

1

2

3

4

5

6

7

1

$167.96

$335.92

$503.88

$671.84

$839.80

$1,007.76

$1,175.72

1.5

$209.95

$419.90

$629.85

$839.80

$1,049.75

$1,259.70

$1,469.65

2

$251.94

$503.88

$755.82

$1,007.76

$1,259.70

$1,511.64

$1,763.58

3

$335.92

$671.84

$1,007.76

$1,343.68

$1,679.60

$2,015.52

$2,351.44

4

$419.90

$839.80

$1,259.70

$1,679.60

$2,099.50

$2,519.40

$2,939.30

5

$503.88

$1,007.76

$1,511.64

$2,015.52

$2,519.40

$3,023.28

$3,527.16

6

$587.86

$1,175.72

$1,763.58

$2,351.44

$2,939.30

$3,527.16

$4,115.02

8

$755.82

$1,511.64

$2,267.46

$3,023.28

$3,779.10

$4,534.92

$5,290.74

Regular Containers at Space-Constrained Locations (Space Saver Rate)

Size

(In Yards)

Weekly Frequency

1

2

3

4

5

6

7

1

$277.13

$369.51

$461.89

$554.27

$646.65

$831.40

1.5

$369.51

$600.46

$646.65

$877.59

$1,016.16

$1,247.10

2

$461.89

$646.65

$831.40

$1,108.54

$1,293.29

$1,478.05

3

$646.65

$1,293.29

$1,662.80

$1,939.94

$2,217.07

4

$831.40

$1,662.80

$2,494.21

5

6

8

Compactor Containers

Size

(In Yards)

Weekly Frequency

1

2

3

4

5

6

7

1

$377.00

$754.00

$1,131.00

$1,508.00

$1,885.00

$2,262.00

$2,639.00

1.5

$471.25

$942.50

$1,413.75

$1,885.00

$2,356.25

$2,827.50

$3,298.75

2

$565.50

$1,131.00

$1,696.50

$2,262.00

$2,827.50

$3,393.00

$3,958.50

3

$754.00

$1,508.00

$2,262.00

$3,016.00

$3,770.00

$4,524.00

$5,278.00

4

$942.50

$1,885.00

$2,827.50

$3,770.00

$4,712.50

$5,655.00

$6,597.50

5

$1,131.00

$2,262.00

$3,393.00

$4,524.00

$5,655.00

$6,786.00

$7,917.00

6

$1,319.50

$2,369.00

$3,958.50

$5,278.00

$6,597.50

$7,917.00

$9,236.50

8

$1,696.50

$3,393.00

$5,089.50

$6,786.00

$8,482.50

$10,179.00

$11,875.50

Note: Above rates are for containers supplied by contractor. Rates for compacted solid waste apply only when such waste has been compacted by any mechanical device prior to its pickup by the collector. Loose waste dumped into the collector’s packer truck from a container will be subject to the rates for noncompacted material. However, waste that has been compressed or compacted by any mechanical device and then subsequently dumped into a loose yard container to be picked up by the contractor shall be subject to compacted container rates only upon prior written approval of the director.

Special Services:

Special pickups shall be charged the extra yard rate multiplied by the size of the container plus the return trip charge.

2024

One-time delivery/pickup/disposal of 3-yard “Rent-a-Bin”

212.91

Additional “Rent-a-Bin” pickup

131.93

Return trip (blocked container, etc.)

20.31

Lock charge (if manual system used)

3.26 per collection

Subsequent deliveries/moves/replacements

36.96 per trip

Accessibility charge

4.61 per collection

Rollout charge

Greater than 15 feet

4.61 per collection

Greater than 20 feet

7.39 per collection

Steam cleaning (customer request or requirement)

55.45 per container

Overfill/extra yardage (or portion thereof)

21.25 per event

Overweight charges for container service:

If the contractor identifies that a customer’s disposal weights are consistently in excess of 130 pounds per loose yard (if charged loose container rates) or 455 pounds per compacted yard, or per yard of heavy material such as dirt, rock, etc. (if charged compacted container rates), the contractor may charge a flat overweight surcharge in addition to the regular rates. The surcharge will be equal to the weight in excess of 200 pounds per loose yard or 700 pounds per compacted yard multiplied by the current disposal rates per pound, multiplied by the number of yards serviced per month. The surcharge may also be applied to any extra or special pickups. The contractor shall not charge the overweight container charge until the ongoing overweight account has been brought to the attention of the director. The contractor may charge the overweight charge once the director has investigated the issue and made a written determination as to whether or not the proposed charge is appropriate to the situation.

Late Fee:

1.5 percent of balance outstanding at 30 days past due date.

Vacation Allowance:

Minimum period of two weeks.

Maximum of three vacations per year. (Ord. M-4422 § 3, 2023; Ord. M-4381 § 3, 2022; Ord. M-4353 § 3, 2021; Ord. M-4316 § 3, 2020; Ord. M-4283 § 3, 2019; Ord. M-4264 § 16, 2019; Ord. M-4240 § 3, 2018; Ord. M-4220 § 3, 2017; Ord. M-4193 § 9, 2017; Ord. M-4144 § 4, 2015; Ord. M-4031 § 3, 2012; Ord. M-4006 § 3, 2011; ACM dated 12/29/2008, CPI Increase; Ord. M-3897 § 3, 2008; Ord. M-3688 § 3, 2005; Ord. M-3631, 2003; Ord. M-3599, 2002; Ord. M-3566, 2001; Ord. M-3518, 2000; Ord. M-3445, 1999; Ord. M-3397, 1998; Ord. M-3334, 1997; Ord. M-3069 § 3, 1993; Ord. M-2980 § 5, 1991; Ord. M-2893 § 9, 1990; Ord. M-2856 § 3, 1989; Ord. M-2665 § 22, 1987; Ord. M-1497 § 12, 1974; Ord. C-33 § 13, 1943)