Skip to main content
Loading…
This section is included in your selections.

901.2.2 Record Drawings. If the installation does not match the approved plans, Record Drawings shall also be provided with the written Statement of Compliance prior to scheduling the final acceptance test(s). The Record Drawings shall be signed by the Designer of Record and the installing contractor. Record drawings may be in “red line” or “clouded” format for inspection, but final approval will not be issued until the receipt of record drawings in final format.

(Ord. M-3819 §3, 2007)